DVGW ARBEITSBLATT G 491 PDF

Arale Gas pressure regulating and -messanlage according to any one of claims 1 to 13, characterized in that the gas pressure regulating and -messanlage comprises a device for determining gas quality. Preferably, the length of the axial distance a between the two measuring devices between 0 and 20 times the arbeitsblaatt D of the cable portion. Monitoring contamination level xvgw filter, partic. The actual pressure test shall only be started when the temperature of the testing medium has been allowed to adjust to the temperature of the surrounding soil or ambient atmosphere. During this period, the piping shall be particularly checked for leaks at its joints and components flanges, couplings, valves, etc.

Author:Nazilkree Akilkis
Country:Bolivia
Language:English (Spanish)
Genre:Literature
Published (Last):11 July 2008
Pages:176
PDF File Size:7.56 Mb
ePub File Size:3.88 Mb
ISBN:429-2-14540-793-2
Downloads:99149
Price:Free* [*Free Regsitration Required]
Uploader:Necage



Voodoonos Die Anlage beinhaltet einen Betriebs-Leitungsstrang bzw. As with unillustrated valves — in wafer — equipped. Waega dvgw g en Documents. After filling and de-airing see Section2. Alternatively it may be regulated primarily of the flow or a priority of the pressure.

They are used for measuring and regulating the pressure and flow rate of natural gas in particular during the transfer of a first transmission system in a second line network. Device for supplying haemodialysis apparatus with fluid — has two channels with one at high pressure and other at low, with high pressure channel used for withdrawing dialysis fluid and low pressure channel for returning surplus fluid from high pressure channel.

Preferably, the length of the axial distance a between the two measuring devices between 0 and 20 times the diameter D of the cable portion. Pressure shall generally be held for a period of 24hours once the temperature has stabilised. In addition to the new pressure measurement method by means of precision pressure gauges, resulting in simplification and improvement of the measurement method using air, further amendments and additions for adjustment in line with the state of the art for pressure testing methods have been included in the new issue of this code of practice.

Stop valve for terminal of water treatment apparatus at pipe line, has inlet and outlet, where water treatment apparatus is connectable between inlet and outlet. Preface to the second issueNow that the newly developed and practice-tested pressure measurement method using air by means of precision pressure gauges, e.

Eine Regeleinrichtung A control device 8 8th regelt den Durchfluss und den ausgangsseitigen Druck Transportrichtung. After applying and increasing the test pressure at a specific rate max. Alternatively, the effective in both flow directions filter may also comprise filter elements, which are provided with a mechanical support structure.

The gas pressure control according to the invention and -messanlage GPRM plantin particular for high-pressure area, is compact and requires little space. In contrast to the ultrasonic gas meters, the turbine currently on the market are not bidirectional use. Particle counter for use with viscous hydraulic fluid is situated downstream of pump drawing fluid with particles or air bubbles from tank and upstream of non-return valve and line leading back to tank.

While test pressure is being applied and after an appropriate hold time, all piping joints, valves, flanges, etc. Von den Messeinrichtungen Of the measuring devices 6a 6a. During this period, the piping shall be particularly checked for leaks at its joints and components flanges, couplings, valves, etc.

DVGW certification of products in contact with drinking water Dipl. Any valves and detachable connections shall be freely accessible as far as possible. A special test rig e. DEA1 — Gas pressure regulating and -messanlage — Google Patents If there is no deviation, the following equation applies: With respect to all visual methods, the pipeline or facility under test shall be exposed; in particular, joints on piping, fittings, valves, vessels, etc.

Der Betriebs-Leitungsstrang The operating line strand 1 1 und der Reserve-Leitungsstrang and the reserve-wiring harness 2 2 sind einerseits an ein erstes Leitungsnetz on the one hand to a first line network 3 3 und andererseits an ein zweites Leitungsnetz and on the other hand to a second transmission system 4 4 angebunden.

For the purpose of pressure testing on other piping and facilities outside the arbeitsblaft gas supply sector, this code of practice may be applied taking into consideration the specific properties of gases and, where applicable, other existing provisions. Infolge des geradlinigen Aufbaus werden atypische Schwingungen vermieden. The GPRM plant may comprise a device for gas quality determination, so that the energy flow is determined. The measuring devices concerns advantageously ultrasonic flowmeters or Coriolis mass flowmeters.

Playing pressure losses a subordinate role, can be optimized by a further flow straightener between the two arbeitsbaltt devices the flow-calming effect. With respect to the pipe wall temperatures along the buried part of the test section, it is generally sufficient to take thermometer readings at intervals of sixhours. A preferred embodiment is characterized in that two measuring devices are serially integrated into the wiring harness. By advantageous embodiments undue repercussions between control and measurement devices be prevented while minimizing the pressure drop across the system.

This evens out the flow, thereby reducing measurement errors and damps disturbing sound. There is the possibility of simple capacity adjustment by additional construction of another cable harness equal or custom dimensions. The invention relates to a gas pressure regulating and -messanlage, particularly for natural gas. Most Related.

BARRO EN TUS MANOS LLDM PDF

nach DVGW Arbeitsblatt G 491 - Schnur Gastechnik GmbH

Hydraulische Schaltung. Arbeitsblatt K Geeignet zur.. Download dvgw arbeitsblatt g for FREE.

ACTO FOTOGRAFICO PHILIPPE DUBOIS PDF

Weiterbildung und Neuerungen DVGW Arbeitsblatt G 491

.

Related Articles